Showing posts with label projects. Show all posts
Showing posts with label projects. Show all posts

Sunday, 17 July 2011

Working on versus in progress

I've been looking at my blog and playing a little with it. I do know that it's not the most exciting look but I prefer the background to the others offered.

One of the things I got rid of was the Blog Roll. I don't use it honestly and found myself a little upset recently when someone else didn't list me on their blog roll, so realised that I didn't list folks I read because they link to their blog posts on their twitter feed or I get them through the Irish Knitting Blogs list. So it's gone.

I also took a look at What's on my Needles and realised that while yes, those projects are technically not finished, and I do want to finish them there's something in the way. I think it was all precipitated by a project that I've been working on, the Roundabout Leaf Tank. I finished the main body yesterday and pulled it on.

Oh dear. It's too tight on the bottom, too loose at the top and I don't think that working on it any more will make it any better. I will rip it, but I'm holding on to it for the moment, I'm not through the mourning period for it yet.

What I am working on is Ivory, Copper & Gold; a cotton t-shirt in the same yarn as failed me before, I have a lot of this and will probably be able to finish it before needing to rip the Roundabout Leaf Tank.

I'm working on a pair of Eagle's Flight Socks for my husband, I wasn't sure how he would take them when I had got a little bit in, but he likes them, which is good.

I'm also occasionally working on Sagrantino Shawl these three form the bulk of my knitting these days.

I really have to get the zip into my pseudo-Biker Jacket but I have zip fear. I also have to add a lot of buttons onto my Purple Versatility and the sleeves need to be ripped out wholesale from the cardigan I've been working on.

What would be a good first moment would be to get some measurements of ME and use them to fix some pieces. That or bribe someone to do the finishing for me!

Tuesday, 3 November 2009

Tuesday, 5 May 2009

Neckwarmer for me, Chimera is the name

Buttons around the back and is just beautiful, field testing will happen tomorrow when I go back to work.

Front
Chimera from the front

Back

Chimera back

Opened out in front

007

Knit in Noro Cash Iroha

Sunday, 15 March 2009

Mio Bandido

He asked for a neckwarmer (he rides a motorbike almost daily) and he asked for it to be in rib for warmth, I saw this pattern Darkside Cowl PDF on Ravelry and thought of him

005

detail
004

It's easier than it looks, I made it about 10inches long instead of the size on the pattern out of Brown Sheep Cotton Fleece bought from This is Knit